December 3rd - 3rd Coast Photography

he locomotive was built in 1941 by Lima Locomotive Works for Pere Marquette Railway (PM). PM ordered this type of locomotive in three batches from Lima: class N in 1937 (PM road numbers 1201–1215), class N-1 in 1941 (numbers 1216–1227) and class N-2 in 1944 (numbers 1228–1239). 1225 cost $200,000 to build in 1941 ($3,217,647 in current dollars). The build was complete on the December 6, 1941 and delivered to the Pere Marquette

Train Expo 2014
Powered by SmugMug Log In